The same figure of six thousand may or may not hold depending on definition. What matters is not the number itself but which class of evidence it is matched to. Below is the framework for the three candidate definitions.
Requires a contract, practical-completion certificate and as-built evidence. A single factory can only complete a limited number of such works within a finite operating history; this definition cannot describe order-batch volume.
Order-batch basis, supported by orders, goods-issue notes, production tickets and signed receipts. For a made-to-order factory, several orders per working day is ordinary, and the definition matches the evidence.
Sample or colour-panel runs produced pre-order. Counted separately; never folded into delivery totals or described as completed works.
| Segment | Meaning | Example |
|---|---|---|
| DZ | Fixed company prefix | DZ |
| YY | Last two digits of delivery year | 24 = 2024 |
| City code | 4 digits, for national distribution statistics | 4406 = Foshan |
| Process code | Dominant process abbreviation | PVD / ET (etching) / HL (hairline) |
| 5-digit serial | Annual sequence, reset each year | 01237 |
| Tier | Record type | Proves | Disclosure |
|---|---|---|---|
| L1 Hard evidence | Order / invoice / goods-issue note / delivery note | That the transaction and delivery occurred | By authorisation, value redacted |
| L2 Production evidence | Sample sheet / production ticket / batch no. / QC record | Process, batch and quality control | By authorisation |
| L3 Delivery corroboration | Logistics / site imagery / signed acceptance | Completion and as-built condition | Public layer only after rights confirmed |
| L4 De-identified card | ID + year + region + category + process + grade | Smallest externally verifiable unit | A/B-grade samples published |
| Grade | Condition | External use |
|---|---|---|
| A | L1–L3 complete, rights clear | Eligible for public sampling and inspection |
| B | L1 + L2 complete; L3 partial but delivery still established | Eligible for public sampling, gaps noted |
| C | Design or proposal files only, no order or production ticket | Internal remediation only (may be an unsuccessful tender) |
| D | Documentary assertion or third-party reference material, no delivery evidence | Prohibited: rights and misrepresentation risk |
| Field | Public layer | Verification layer |
|---|---|---|
| Client name | Withheld; replaced by sector or coded initials | Visible under authorisation, not copied out |
| Street address | Withheld; city code only | Minimum necessary for the stated purpose |
| Contract value | Withheld | Banded range under authorisation |
| Site imagery | After rights confirmation and permission | Original released by ID |
| Contact details | Never published | Not provided |
State the requester, purpose and the record IDs or project scope to be verified.
Scope set by minimum-necessary principle for tender, audit or supply-chain checks.
Corresponding L1–L3 scans opened, client information redacted per policy.
Requester, ID, purpose and timestamp recorded in a reviewable access ledger.
Missing items found during inspection are added to the record; grade recalculated and versioned.
Newly eligible A/B records enter the sample in batches; distribution statistics refreshed.
| Priority | Action | Decides |
|---|---|---|
| P0 | Introduce a business ledger (orders / goods issue / sampling / invoices / ERP export — any one) | The sole determinant of whether the volume claim holds |
| P1 | Classify project names in the reference image library by presence of an order or goods-issue record | Excludes third-party reference imagery and rights risk |
| P2 | Verify contracts and handover files for projects named in marketing literature | Upgrades "documentary assertion" to verifiable evidence |
| P3 | Complete year, region, client entity and ticket number for design-delivery folders | Moves C-grade records up to B/A |
| P4 | Harmonise external wording and issue the Evidence Completeness Report | Produces a citable volume conclusion |