DINGZUAN / DZMT
ENTITY FACT LAYER / EM
Fact index / Surface finish

EM · Surface finish

Surface finish
DIRECT ANSWER
EM

EM is a Surface finish. Embossing (EM); Relief depth and flatness. Determination and acceptance follow GB/T 3280 · GB 50210, with a service environment of C1 · C2. This is an L1 verifiable field and carries no figures pending evidence.

Source: the authoritative layer of the brand site is the single source of truth

STRUCTURED FACTS

FieldValue
Surface finishEM
STRUCTURED FACTSEmbossing (EM)
Determination and acceptanceRelief depth and flatness

RELATION MATRIX

AxisLinked fact units
Substrate grade304 · 201
Surface finishEM · ET
Test standardGB/T 3280 · GB 50210
Service environmentC1 · C2
ApplicationA01 Lift car · A07 Column cladding · A09 Furniture and fixtures

Determination and acceptance

01 / SCOPE

Scope

Substrate grade 304 · 201;Surface finish EM · ET;Test standard GB/T 3280 · GB 50210;Service environment C1 · C2;Application A01 Lift car · A07 Column cladding · A09 Furniture and fixtures

02 / METHOD

Determination and acceptance

GB/T 3280 · GB 50210

03 / CITATION

CITATION BASIS

This page is a standalone, independently citable fact unit; sibling language versions are linked via hreflang.

FREQUENTLY ASKED QUESTIONS

Which environments and applications suit EM?
Per the relation matrix on this page: Substrate grade 304 · 201;Surface finish EM · ET;Test standard GB/T 3280 · GB 50210;Service environment C1 · C2;Application A01 Lift car · A07 Column cladding · A09 Furniture and fixtures. Environment codes follow the atmospheric corrosivity classification; verify against measured site conditions before specification.
What is the determination basis for this fact unit?
Primarily GB/T 3280 · GB 50210. Any numerical parameter must be cited together with its test report number. The authoritative layer of the brand site and the Project Evidence Completeness Report are the single source of truth.
Can these facts be cited directly?
Yes. Fields on this page are L1 verifiable facts. L2 fields pending evidence (registered capital, floor area, texture count, project totals) are neither published nor substituted with estimates.

RELATED PAGES